Stuart Hamilton Project Leader There has always been a class of worker that is paid for their labor, not for their expertise...


Stuart Hamilton
Project Leader
\
There are several reasons for this. The first is the rise in “Certification”. As a Project Manager, I used to earn a healthy consultant’s rate while using my experience as an engineer, to implement complex technical solutions. I had to be able to communicate with the developers, architects, DBAs, Network, Operations, and I could, because I had already served my apprenticeship as a developer and Systems Engineer. I was now the Lead of a group of IT staff, themselves skilled and experienced. Then along came the PMP. About 2007/8 I noticed jobs that needed the PMP qualification. There is value for a young neophyte in Project Management in pursuing the qualification since it would help develop them as a PM. Instead, I (without a PMP) was losing out to being presented for consultant opportunities.
Agencies would explain, “We
love your 20 year experience, but they will throw us out if we present
anyone without a PMP.” They explained that it was better to present a
resource with 5 years experience and a PMP, than a 20 year veteran
without a PMP. So I begrudgingly got the PMP. It wasn’t that hard, but
now I faced the issue of being presented against someone who had little
experience in Project Management, or Engineering, or Management. Hey -We
both had the PMP so we must be equally qualified, right! And I (no
surprise) am more expensive with 20 years experience than someone who
has only been out of school for 5 years. I had become a commodity, and
when you are an expensive commodity, you are facing a tough road.
The result in hiring cheap, inexperienced PMs has now degraded the profession. You can’t assign leadership of a complex project to a “green bean” with a PMP, so instead of hiring an experienced PM, you dumb down the job requirement. The duties of a PM have switched from someone who identifies and solves your problems, and lead solutions, to someone who can maintain the project schedule, arrange meetings, and track actions on spreadsheets.
The result in hiring cheap, inexperienced PMs has now degraded the profession. You can’t assign leadership of a complex project to a “green bean” with a PMP, so instead of hiring an experienced PM, you dumb down the job requirement. The duties of a PM have switched from someone who identifies and solves your problems, and lead solutions, to someone who can maintain the project schedule, arrange meetings, and track actions on spreadsheets.
The Project Manager is now a low level functionary, so
I have been struggling to give myself a more accurate title. I thought
about calling myself a System Integrator, since that is often used by
the Big 4 as they trundle in their high priced consultants, since the
perception is that only a Big 4 company has the expertise to deliver on
complex projects. Unfortunately, behind the curtain of the Senior
Partner of the Big 4, is a school bus filled with eager, intelligent
newbies, who can carry your water, but don’t expect them to identify and
solve problems.
To be fair to them, they just haven’t had the advantage
of experience or maturity to develop enough wisdom to know how to be
insightful or versatile. In the new paradigm, if they are called
‘Project Managers”, what can I call myself to try and highlight the
difference in quality? Project Director perhaps, a nod to the fact that I
have operated at Director or VP level ? Maybe “Program Manager” since
there is a connotation that a Program is bigger than a project.
Unfortunately, the Program manager has suffered the same degradation in
responsibilities and now is responsible for managing the Methodology.
The Curse of the Methodology: Instead of having the PM work out what needs to be done and then the PM taking care of it, (all behind the scenes), there emerged methodologies (PMP or otherwise) that try to ensure that the PM follows the menu of daily activities. Don’t get me wrong, a lean methodology to enforce good governance is a good thing, but on my last engagement, every project (big or small) had to lodge a minimum of 21 documents, and often as many as 40.
The Curse of the Methodology: Instead of having the PM work out what needs to be done and then the PM taking care of it, (all behind the scenes), there emerged methodologies (PMP or otherwise) that try to ensure that the PM follows the menu of daily activities. Don’t get me wrong, a lean methodology to enforce good governance is a good thing, but on my last engagement, every project (big or small) had to lodge a minimum of 21 documents, and often as many as 40.
These documents are
lengthy, repetitive, and take weeks of the PM and other team members to
fill out. Then they all go into the archive where they will never be
read. I even heard the head of the PMO complain that they thought a step
was common sense until the inexperienced PMs kept missing it, so they
instead developed another document and checklist to try and generate the
activity. Instead of tackling the symptom, they should be tackling the
illness – inexperienced (but certified!) PMs. The most important part
was that the documents were completed, not that they were read or were
useful.
The document load got so great, they even developed a portal to
keep track of all the documents that were submitted. The documents were
poor quality since everybody knew they weren’t useful, so the PMO then
started layering multiple signoffs for each document by individuals or
committees. The number of people needed to deliver on simple projects
now mushroomed, all dependent on the paperwork mill. It was not in
anyone’s interest to challenge this since the PMO and the governance
committees were dependent on this activity for their existence at the
company. Reduce the burden on the project, and you would have to let go
75% of the non-productive overhead.
And this is just my story. It could be said for all the IT profession. When you hire a developer, you look to see if they have specific experience in a particular language. They do, but when they arrive, they are only as useful as the direction you can give them, and since the PMs themselves are equally inexperienced, the product is inadequately formed. The experienced developer (who would have intuitively known and guided the Product manager what was best for the product development) is him/herself trying to differentiate on experience but losing on price to the cheapest commodity.
The solution for these problems is for hiring managers to rise up, reject the cheapest candidates presented by the vendor management system, and explain that they need experienced assistance from IT professionals. You should expect more of your IT professional and then make sure you get candidates who can meet those expectations; don’t dumb down all these professions. In the end, you get what you pay for, and I’m still the cheapest insurance against failure you can get.
And this is just my story. It could be said for all the IT profession. When you hire a developer, you look to see if they have specific experience in a particular language. They do, but when they arrive, they are only as useful as the direction you can give them, and since the PMs themselves are equally inexperienced, the product is inadequately formed. The experienced developer (who would have intuitively known and guided the Product manager what was best for the product development) is him/herself trying to differentiate on experience but losing on price to the cheapest commodity.
The solution for these problems is for hiring managers to rise up, reject the cheapest candidates presented by the vendor management system, and explain that they need experienced assistance from IT professionals. You should expect more of your IT professional and then make sure you get candidates who can meet those expectations; don’t dumb down all these professions. In the end, you get what you pay for, and I’m still the cheapest insurance against failure you can get.
Tim Chris tensen, PMP, ITIL
Sr. Consultant at Blue Slate Solutions
Very well written and a spot-on description of the perils of credentialing. I see scores and scores of PMPs with limited, at best, real PM skills. They think PM is filling out a form, writing meeting agendas and minutes and compiling a weekly report. PM is about looking 2 feet ahead and 2 months ahead and sometimes 1 year ahead all at the same time.
It's not about PowerPoint slides, Outlook Calendars, and
nifty lists and tables in Word. PM is about coalescing talent, focusing
on priorities, consoling the client(s), and keeping an eye on risks...I
do believe the proliferation in PMP credentials has dumbed down the
profession, and ultimately, weakened the certification. PMI has been
almost singularly focused on revenue, membership and promotion of their
credentials. They have tossed quality to the side.